Infrastructure
Infrastructure asset register
Ageing roads, drains, water and sewer systems ranked by risk and backlog.
| Asset | City | Type | Condition | Risk | Backlog |
|---|---|---|---|---|---|
| Chitungwiza trunk sewer line Emergency jetting, CCTV inspection and staged pipe replacement | Chitungwiza | Sewer | 22% | Critical | $7,800,000 |
| Harare water treatment plant module Chemical supply guarantee, pump overhaul and capacity upgrade | Harare | Water | 38% | High | $12,500,000 |
| Mbare stormwater drains Desilt drains, clear culverts and install anti-dumping screens | Harare | Drainage | 41% | High | $2,200,000 |
| Highfield local road network Patch high-risk potholes, repair road shoulders and regrade drainage | Harare | Roads | 47% | Medium | $4,600,000 |
| Kuwadzana refuse collection fleet Lease additional compactors and publish collection schedule | Harare | Waste | 31% | High | $1,900,000 |